Sanmet Policy Download Contact Sanmet

How We Work

Asphalt surfacing cannot be undertaken until all the ground-work has been completed.

The preliminary groundworks are of paramount importance in providing a satisfactory base upon which to build, with particular attention being paid to compaction, surface water drainage flows, perimeter boundaries and kerbing works.

Sanmet’s in-house groundwork teams have gained a reputation for reliability, and quality workmanship. On completion of the ground-works a memebr of our management team will inspect and approve prior to the commencement of surfacing works, when an experienced surfacing team will be assigned to complete the project utilising our up to date plant and machinery.


We supply and lay a wide range of surfacing materials to meet your requirements all manufactured in accordance with BS EN 13108.

These include: 

  • Asphalt Concrete
  • Stone Mastic Asphalt
  • HAPAS Approved Thin Surfacing Systems to Clause 942
  • Hot Rolled Ashaplt
  • Coloured Asphalts
  • Various Proprietary Mixes


At Sanmet Limited we work to strict QHSE guidelines. We operate a comprehensive quality management system BSEN ISO 9001: 2008 which includes National Highway Sector Scheme: Sector 16 for laying of Asphalt Mixes.

We hold CHAS accreditation and team members hold the appropriate CSCS certification, EITB Passport to Safety, National Plant Operators Certification and Streetworks Certification.